(3)
(4)
(1)
Make the wiring connections to the AC
source main panel.
(2) Route the AC cable to the inverter/
charger.
(3) Remove the wiring compartment cover
panel on the inverter/charger.
(4) Remove the AC knockouts from the side
or bottom (or both). Do not leave the
knockout inside the wiring compartment.
(5) Install a strain-relief clamp in the AC
knockout.
(6) Route the AC cable through the AC
knockout and inside the wiring
compartment.
(7) Connect Line to L, Neutral to N,
earth to . If solid ground wire is being used,
the wire can be connected directly under the
screw heads. If stranded ground wire is
being used, ring terminals must be used.
(8) Tighten the terminal
screws. Leave a service
loop in the wires inside the
wiring box.
(9) Make the wiring
connections to the inverter
load panel.
(10) Replace the wiring
compartment cover panel
on the inverter/charger.
side AC
knockouts
bottom AC
knockouts
to Inverter
AC INPUT
strip at least
50mm
strip at least
13mm
Inverter Load Panel
AC Source
Main Panel
NOTE: Make the connections to the AC INPUT
side first (steps (3) to (8)) then the AC OUTPUT
side (steps (4) to (9)). Finish with step (10).
(9)
(1)
(2)
Transfer switch