3–8 975-0637-01-01
This guide for use by qualified personnel only
Figure 3-6 Dual-Inverter System Renewable Energy (Solar) Wiring
Battery
Negative
Battery
Positive
Xanbus Stacking REM BTS
Battery
Negative
Battery
Positive
Xanbus Stacking REM BTS
Solar Charge Controller
BATT
+
BATT
PV
PV
+
Solar Charge Controller
BATT
+
BATT
PV
PV
+
Solar Charge Controller
BATT
+
BATT
PV
PV
+
Solar Charge Controller
BATT
+
BATT
PV
PV
+
System Control
Panel (optional)
DC Disconnect
Renewable
Energy
Vented Battery
Enclosure
Battery Temperature Sensors
(BTS)
24-volt Battery Bank Enclosure
xantrex
CC
+
CC
+
Utility
Grid
Earthing
Electrode
Conductor
Main
AC Distribution
Panel
xantrex
Xanbus
Network
Terminator
Photovoltaic
DC
Combiner
Box
Photovoltaic
DC
Combiner
Box
Conext SW DC Switchgear
DC Disconnect
CC
+
CC
+
Photovoltaic
DC
Combiner
Box
Photovoltaic
DC
Combiner
Box
Negative (–)
Positive (+)
Earth
DC LEGEND
DC Cable
120/240 Vac or
240 Vac only
AC Generator
Conext SW Inverter/Charger
Negative (–)
Positive (+)
BATTERY
LEGEND
Earth
Bus Bar
Neutral-to-Earth
Bond inside.
NOTE: Be sure to check the
generator for a neutral-to-earth
bond and remove it. There can
only be one neutral-to-earth
bond in the system.
System Con trol Panel
Ente
r
Exit
Fault/Warning
System Status
Battery 20.4 A 53.9V
BatLev E --F
Load 1235W
AC 1 115 W 3202V
Menu
Standby
12: 00 AM Jan 01
Conext SW DC Switchgear Conext SW Inverter/Charger
Generator
Disconnect
Earth
Neutral
LINE
LINE
Inverter
AC Distribution Panel
NEUTRAL
Earth
Neutral
LINE
Earth
AC LEGEND
AC Cable
Conext SW AC Switchgear
AC Switch
GRID GEN
i
n
t
e
r
l
oc
k
This AC Switch is a
customer-supplied
component.
N
INV 1
IN
INV 2
IN
BY-
PASS
BY-
PASS
INV 1
OUT
INV 2
OUT
AC Breakers
NOTE: If no Grid is available,
the generator can be connected
to the AC breakers in the
Conext SW AC Switchgear,
instead of to a separate AC
Generator Disconnect.
Battery System Ground
Connect to
inverter’s
Chassis
Bonding
Lug
interlock
The actual positions of the
Negative shunt and Ground bus
may be different than what is
shown here. This drawing is for
illustration purpose only.
The actual positions of the
Negative shunt and Ground
bus may be different than what
is shown here. This drawing is
for illustration purpose only.
Install a DC breaker
on the positive line.
Install a DC breaker
on the positive line.
Automatic Generator
Start (optional)
Xanbus
Network
Terminator
Power
Generator On
Network
Fault
Automatic Generator Start
Conext ComBox
(optional)
Communication Cable
(Category 5)
BTS
ACCESSORIES
ConextSW_IG_3_Wiring Diagrams_11x16p6.fm Page 8 Wednesday, December 5, 2012 10:59 AM
Vista de pagina 71
1 2 ... 67 68 69 70 71 72 73 74

Comentarios a estos manuales

Sin comentarios